| By Marchesini Group |
| Friday, 19 March 2010 |
 |
Having commenced the year 2010, Marchesini starts the countdown in October for
the opening ceremony of
|
|
the group’s new logistics building and for the Top event of the year: the 5-day Open House (18-22 Oct). For Marchesini Group, the concept of creating a new building does not just mean
giving life to a new structure that will allow the business to concentrate all the group’s logistic activities effectively and strategically but it means first and foremost
to plight its troth in a project focused on eco-compatibility and environmental
sustainability. The building, designed by Architect Stefano Visinelli, has indeed been |
|
 |
devised
and built to reduce environmental impact and maximise energy efficiency.
The building – which develops over three thousand five hundred square meters
and that involves an investment of approximately € 6,500.000 – will have an
Airklima geothermal plant that will be able to guarantee a comfortable work
environment (warm in winter and cool in summer), exploiting an environment
friendly technology.
In view of these features, the project represents a way of doing
business aiming at ever-sustainable development, aware and respectful of the
environment, in which Marchesini Group has always believed and invested. After cutting the tape, the new building will welcome customers |
 |
from all over the
world, together with specialist press members during the “Open House of
Marchesini Group”, the top event of 2010.
Five days of “open doors” offering
guests the opportunity to take a look at Marchesini’s new complete lines and standalone
machines actually at work, all of which involve cutting edge solutions for
packaging pharmaceuticals and cosmetics.
Want to read more?
AseptiQuik™ Connectors Create Quick and Easy Sterile Connections Even in Non-Sterile Environments
Aesica listed in The Sunday Times Buyout Track 100
Thermo Fisher Scientific Announces New Water Quality Specifications |
 |
|